How to bid landscaping

Question:

How do I bid some landscaping?
I have some work that a friend wants me to do. He needs a couple flower beds put in with some brickpavers, top soil, and mulch. Should I bid by the square foot or figure out the cost of materials and then estimate the amount of hours it will take?

Answer:
Cost of materials +10%
Labor + costs of insurance and other benefits. Usually 35% of labor costs will cover that.
Other overhead: Cost of gasoline, truck insurance, office costs, paper, pens, computer, etc.
Any other costs included in the job.
Add it up and add at least 15% profit.
That should do it for you.